How to use
Processing temperature: 70°C – 420°C
When cleaning keep the same parameters ( such as temperature, screw speed etc.) as the last material to be processed and emptying and clean from old material.
BARREL , SCREW, NOZZLE and HOT RUNNERS
1. Upload and purge material (Virgin or next production) an amount to eliminate the big of dirty.
2. Empty the plasticizing group (HOPPER AND BARREL EMPTINESS )
3. While the screw turns put in into the throat of load the tabs (WITHOUT OPENING ) P&P
P&PCream™ Tabs ( see table ) queued upload and purge with virgin material until P&P
P&PCream™ Tabs come out from the nozzle
4. Stop the machine and leaves for few minute, then
5. Purge it with virgin material to eliminate all residue removed by P&PCream™ Tabs
6. If the system needs repeat Phase 2 to phase 5
7. Then start the new production .
HOT RUNNERS:
After the cleaning of the cylinder,screw and nozzle, increase the Temperature of the hot runners as much as allowed by the Material inside.
At the mould open or moulding repeat: phase 1 to phase 6
Download the Manual in PDF
Scarica il manuale di utilizzo in PDF
Injection moulding machine | Barrel capacity | Nr. Tabs |
---|---|---|
50 Tonn | 0.2 Kg | 1 |
100 Tonn | 0.5 Kg | 1 |
200 Tonn | 1.0 Kg | 1 |
400 Tonn | 2.0 Kg | 2 |
600 Tonn | 3.0 Kg | 3 |
800 Tonn | 4.0 Kg | 4 |
1000 Tonn | 5.0 Kg | 5 |
1500 Tonn | 7.5 Kg | 7 |
2000 Tonn | 10.0 Kg | 10 |